CREATE 4D Simulation
UC (Use Case) – 4D Simulation
Federated 3D Model together with Coordination & Clash Check shows objects in their final installed position.
4D construction simulation shows the objects and space needed during construction.
To build a 4D Simulation all you need is a Federated 3D Model and a Planning Schedule. Link between these two will result into a motion/video of the 3D Elements as listed in Planning Schedule.
UC (Use Case) – 4D Simulation
As explained by Autodesk 90%+ of 4D Simulations going on in the industry is for show only. Very few examples exist where 4D is implemented in a way that improves communication and on-site efficiency.
We are here to showcase that 4D Simulation can contribute to the Project Constructability in a more efficient way (Cost -Collaboration) including also site Camera Live Capture and Laser Scanning Data.
UC (Use Case) – 4D Simulation
Included in the best strategies of 4D Simulations are the following aspects :
- The 3D Federated Model is Coordinated in the right way.
- Choose what type of 4D Simulation you are performing
- Choose the Software/ Cloud Platform to create 4D Simulation
- Check the size of the 3D Model and No of the 3D Part Models
- Check the Activities and data in the Planning Schedule
- Linking 3D Elements Data with Planning Schedule Data
- Define LOD 4D Simulation (Level of Detail)
- Choose Rendered quality of the 4D Simulation
- Supercharge collaboration including Cloud Collaboration
- BI Reporting of the 4D Simulation